Building a family house in Bratislava or the surrounding area? We will design a Daikin heat pump based on your project, install it and look after its servicing. We have completed approximately 150 heat pump installations. It is best to contact us before the first-fix pipework at the latest.
Why to get in touch before the first-fix pipework
At this stage everything can still be prepared without chasing walls or making later changes. You can decide in time about things that are hard to change later:
- the place for the outdoor unit, with regard to noise, neighbours and defrost water drainage,
- the plant room for the indoor unit and hot water tank,
- pipe routes and the electrical supply,
- the type of heating, especially underfloor heating and its water temperature,
- whether you also want cooling in summer, because the unit, controls and heating system must all allow for it.
What we will prepare for you
- An output design based on heat loss from the project or energy performance certificate, not an estimate from the floor area. New builds have low heat loss and an oversized unit switches on and off unnecessarily often.
- A choice of Daikin Altherma unit based on the house, hot water consumption and the space in the plant room.
- A quote with the exact scope of work.
- Installation and commissioning, including setting up the controls and explaining how to operate them.
- Servicing after installation from the same company.
Which models suit a new build
- Daikin Altherma 3 R F – a low-temperature solution with a floor-standing indoor unit and integrated hot water tank.
- Daikin Altherma 3 R W – a compact wall-mounted indoor unit, with an optional tank.
- Daikin Altherma 3 M – a monobloc with one outdoor unit and a simpler installation.
The overview is based on the manufacturer’s data. The suitable model is determined by the design for your house. We explain the differences in the article Monobloc or split heat pump: the differences.
How we proceed
- You send us the project or energy performance certificate and tell us what stage the build is at.
- We assess the heat loss and propose the unit, output and positions of the units.
- We prepare a quote.
- We agree on what to prepare before the first-fix pipework and before completion.
- We install, set up and commission the unit.
What to prepare
- project documentation or an energy performance certificate,
- the type of heating, for example underfloor heating,
- the number of people in the household,
- a provisional place for the plant room and outdoor unit,
- whether you want cooling and whether you are planning photovoltaics.
Subsidy for a new build
The Zelená domácnostiam II contribution is not provided for houses under construction. The house must be registered in the land register and have a registration number. So do not count on the subsidy in advance during construction. Check the conditions on the Subsidies page. Climaservice s.r.o. is certified to install heat pumps eligible for the state subsidy.
Where we work
We handle new builds in Bratislava and the surrounding area, for example in Stupava, Chorvátsky Grob, Ivanka pri Dunaji, Bernolákovo, Pezinok and Senec. You will find examples of our work under projects.